Floorhand for Drilling Rig (US)

Job Description

Primary work station is on the rig floor; work includes tripping pipe (use of slips, tongs and elevators), making connections while drilling; assisting the Derrickman; monitoring the shakers which includes mud weight, viscosity and controlling sand content while drilling.
Work schedule is 14/14. Must provide own transportation to/from work location. Must be able to pass physical and drug screen.

To see the contact details, you need click the "APPLY JOB" button