Cost Control Engineer for Oil and Gas Project (Nigeria)

Job Description

Target Start date: January 2025
Estimated Service Duration : 1 year renewable
Ntokon project is a development in OML102 block in Nigeria based on minimalistic wellhead platform tied-back to Ofon OFP2 CPP via 26km pipelines (1 multiphasic production line, 1 water injection line).
Ntokon is an innovation driven Project with Conductor Supported Platform and Zapock pipeline concepts to be rolled-out.
FEED will start October 2024 for 5 months, FID is expected end Q1 2025 and first oil Q2 2027 which intends to make Ntokon the flagship of Totalenergies capacity to develop ressources in minimal time.
The Ntokon Project will be developed with the objectives to maximize economical results by optimizing the reserves, the schedule, reducing the costs and the Greenhouse Gas (GHG) emission, while maintaining the technical quality of the installations, with high H3SE requirements and focus. Project overall value: 700 MUSD
Package value: CAPEX 450 MUSD (3-4 packages), DRILLEX 250 MUSD
Staff managed (number of personnel): 1 pre-FID – 20+ post FID
Context and environment: Nigeria
The service holder is responsible for coordinating and supervising the Cost Control activities of contracts that could be necessary during the Life of Project and FEED activities up to the close out.
To apply you have to click on the APPLY JOB button.